jeudi 30 mai 2019

CYLINDER HEADS JOB

(5 hrs)




HEADS HAS BEEN DEGREASED BEFORE FOR A CLEAN STRIPPING APPART







REMOVED VALVES, SPRINGS, SHIMS, STEM SEAL, READY FOR A GUIDES & VALVES CHECK


EXHAUST VALVES


AFTER BRUSH, HERE IS A PITTED EXHAUST VALVE.

ALL OF THEM, PRESENTS THE SAME SIGNS.

THEY'LL BE RECUT WITH NEW GUIDES PROVIDE.

 THE 6 GUIDES HAS THEY WEAR LIMITS REACHED.

THE SEATS WILL BE RECUT TOO.



INTAKE VALVES


THE INTAKE VALVES SEALING SURFACES ARE JUST PERFECT AND GUIDES HAS ALMOST NO PLAY,  JUST A SEATS RECUT WILL BE DONE FOR THOSE ONES.



DISLODGE THE EXHAUST VALVES GUIDE


HEAD ON THE BURNER GAZ




USING A APPROPRIATE DRIFT WILL FACILITATE THE JOB TO PRESS OUT THE GUIDE PROPERLY.





HEADS WAITING FOR THEIR NEW EXHAUST GUIDES


Labor : 5h


Aucun commentaire:

Enregistrer un commentaire

ASSEMBLY THE ENGINE part 2 (long bloc)

(14 hrs) PISTONS & CYLINDERS    ( 6hrs)   HEADS / CAMSHAFT HOUSINGS    (8 hrs) ...