jeudi 30 mai 2019

CYLINDER HEADS JOB

(5 hrs)




HEADS HAS BEEN DEGREASED BEFORE FOR A CLEAN STRIPPING APPART







REMOVED VALVES, SPRINGS, SHIMS, STEM SEAL, READY FOR A GUIDES & VALVES CHECK


EXHAUST VALVES


AFTER BRUSH, HERE IS A PITTED EXHAUST VALVE.

ALL OF THEM, PRESENTS THE SAME SIGNS.

THEY'LL BE RECUT WITH NEW GUIDES PROVIDE.

 THE 6 GUIDES HAS THEY WEAR LIMITS REACHED.

THE SEATS WILL BE RECUT TOO.



INTAKE VALVES


THE INTAKE VALVES SEALING SURFACES ARE JUST PERFECT AND GUIDES HAS ALMOST NO PLAY,  JUST A SEATS RECUT WILL BE DONE FOR THOSE ONES.



DISLODGE THE EXHAUST VALVES GUIDE


HEAD ON THE BURNER GAZ




USING A APPROPRIATE DRIFT WILL FACILITATE THE JOB TO PRESS OUT THE GUIDE PROPERLY.





HEADS WAITING FOR THEIR NEW EXHAUST GUIDES


Labor : 5h


dimanche 26 mai 2019

PARTS PREPARATION & CONTROL

(7 hrs)


MEASUREMENT OF THE CRANKSHAFT LINE



SOFT MATING SURFACE STRAIGHTEN FOR ELIMINATION OF DIRTS AND GLUE.




AFTER A COMPRESSED AIR SESSION AND A PERFECT MATING SURFACES,  BOTH HALF CRANKCASE GET ASSEMBLED WITHOUT ANY BEARINGS, EXCEPT THE N°8 BEARING IN PLACE WITHOUT THE CENTER PIN.


WRENCH 
SET UP AT 5 Kg.m / 50 N.m



3.6L ENGINE REQUIRED : 

5 Kg.m / 50N.m FOR THE M10 BOLTS & NUTS.

 2.5 Kg.m / 25 N.m FOR THE M8 ONES AROUND THE FLYWHEEL AND PULLEY AREAS.

GENTLY TIGHTEN FIRST GENERALLY

 STARTING FROM THE CENTER (N° 4 BEARING) 

(with a long piece of wood tap the n°8 bearing out of his place before tightening around it)

EVERYBODY NICELY TO TORQUE SPEC.





SETTING THE MEASUREMENT TOOLS 








OUT OF SPEC., 

NEED TO BE MACHINED FOR A 0.25mm OVERSIZED BEARINGS BORE


RODS CHECK


CON ROD ASSEMBLED WITHOUT BEARINGS


WRENCH SET UP AT 5 Kg.m / 50 N.m











Labor : 7h

ASSEMBLY THE ENGINE part 2 (long bloc)

(14 hrs) PISTONS & CYLINDERS    ( 6hrs)   HEADS / CAMSHAFT HOUSINGS    (8 hrs) ...