samedi 23 novembre 2019

ASSEMBLY THE ENGINE part 2 (long bloc)

(14 hrs)


PISTONS & CYLINDERS  (6hrs) 










HEADS / CAMSHAFT HOUSINGS  (8 hrs)



















(pistons/cylinders + heads / camshaft housings) TOTAL LABOR (14Hrs)


ASSEMBLY THE ENGINE part 1 (short bloc)


(9 hrs)



CRANKSHAFT / RODS  (4 hrs)









CRANKCASE ASSEMBLY (5hrs)












(crank shaft/rods + crankcase assembly) TOTAL LABOR : 9Hrs

ENGINE RECTIFICATION JOBS

(8hrs1/2) 


ENGINE CASE READY FOR A 0.25mm RESIZING







CLEAN & READY FOR A TEST FEET


NEW BEARINGS SET


ASSEMBLED & TORQUED AT SPEC.

(only the crankshaft with the new bearings are installed for the test feet)



RODS JOB


PISTON PIN BUSHING REPLACED FOR NEW ONES WHILE THE BIG END WILL REMAIN STD. WITH  NEW  BEARINGS, BOLTS & NUTS SETS.






CRANKSHAFT JOB


CRANKSHAFT JOURNALS 'S MATING SURFACES POLISHED 


HOT PRESSURE WASHING, RINSE & BLOW 


READY TO THE TEST FEET CASE


Labor : 8 1/2 hrs

ASSEMBLY THE ENGINE part 2 (long bloc)

(14 hrs) PISTONS & CYLINDERS    ( 6hrs)   HEADS / CAMSHAFT HOUSINGS    (8 hrs) ...